Overview
- This project is designed to reflect a futuristic Living Elegant, Spacious, Well Lit and Modern Units
- Total of 9000 residential units of 1, 2 & 3 Bedrooms
- A Shopping Mall, hotel and a school will be added in Phase II & III of the Project.
- Served by two roads from the Highway and an extra entrance from the new Bypass.
Utilities
- An In-house Power Substation served by a 66KV HT line
- A Reverse Osmosis Water Treatment Plant.
- Two Standby Gensets to serve critical services (lifts, hallway lighting & Security Lighting) Utilities.
- An In-house Power Substation served by a 66KV HT line.
- A Reverse Osmosis Water Treatment Plant.
- Two Standby Gensets to serve critical services (lifts, hallway lighting & Security Lighting) Solar Panels will be integrated in the smart Power Management system.
Units
- 1 Bedroom with Open Kitchen, Mini Bar, Laundry Space, Pantry, Balcony from the Bedroom
- 2 Bedroom will comprise of the above in addition the master bedroom will be en-suite
- 3 Bedroom as above
- All apartment blocks will be served by 2 modern elevators.
- Emergency power lighting for hallways and elevators will be provided during outages.
Services
- Modern and well marked Traffic Management system
- Separate Jogging Lanes, Bicycle Lanes and Skating lanes
- Wide Open Spaces for kids to play
- An integrated well managed security system
- Well maintained garden plants
- Janitorial services for Hallways.
- Ample & wide parking spaces.
Geographical Sites
- On a clear day from the rooftops Mt. Kilimanjaro, Mt. Kenya, Aberdare Ranges & Kilimambogo are visible
- There is a Proposed Privae University in the next property.
Number of Units : 9000
Project cost: KES 23.4 Billion
Investment Amount: KES 16.38 Billion
Internal Rate of Return (IRR) 34%
Return on Investment (ROI) 63%A
Contact us at info@princelinkventures.com or call me on +254722179687